Task / Description Slow   Ave   Fast    Units
 Steel Frame and Roof Members 3.4  -   4.6   Tons/day
 Wall Frame, Bow String Truss and Frame -   1.6  -    Tons/day
 Roof Frame, Curved Truss and Frame -   5.2  -    Tons/day
 Wall Frame, Glazed Frame and Atrium -   0.3  -    Tons/day
Task / Description Slow   Ave   Fast    Units
 Granolithic Flooring -   3.1  -    m2/hr
 Terrazzo Flooring, in-situ -   3.6  -    m2/hr
 Terrazzo Flooring, pre-cast -   4.6  5.1   m2/hr
 Mosaic Tiling, 0.045x0.045m -   1.5  2.2   m2/hr
 Clay, quarry Tiles, small areas, much cutting -   0.8  1.1   m2/hr
 Clay, quarry Tiles, large areas, little cutting -   2.2  2.8   m2/hr
 Raised Floor System -   2.6  -    m2/hr
 Linolium/Thermo-Plastic Flooring -   3.1  5.0   m2/hr
 Thermo-Plastic Floor Tiles -   3.3  5.6   m2/hr
 Wood Block Flooring, lay blocks -   1.5  2.1   m2/hr
 Wood Block Flooring, sand and polish -   3.1  -    m2/hr
 Carpeting, Underlay & Gripper -   5.6  6.1   m2/hr
 Carpeting, Adhesive Fixing -   3.5  4.2   m2/hr
 Carpeting, Fully Fitted -   2.0  2.8   m2/hr
 Hardboard Sheeting Coverings, small areas -   3.7  4.1   m2/hr
 Hardboard Sheeting Coverings, large areas -   6.6  7.2   m2/hr
 Floor Sheeting Coverings, Lay Lino -   9.5  10.5   m2/hr

Choose Your Server

 Starting new projects and concepts is what makes us tick. So go on, get in touch. Drop us a line:

Sun Trees | Indigenous tree nursery, specimen tree trade, consulting tree architect and tree relocation

WaLS | architecture design | lampen-smith william

 
 
 

Power of Methvin

Register and start pricing immediately

Login Online