Planning Production Rates

Task / Description Slow Ave Fast Units
Boarding to Plaster dabs 3.6 4.0 5.5 m2/hr
Boarding to Stud-work/Metal Lathes 4.0 5.0 6.7 m2/hr
Boarding 12mm nailed to studding - 12.5 - m2/hr
Boarding 19mm nailed to studding - 16.5 - m2/hr
Tape, Jointing and Sanding - 0.1 - hrs/m