Planning Production Rates

Task / Description Slow Ave Fast Units
Metal KwikStage, 5 Boards with 2m lifts 11.1 11.9 12.5 m run/hr
Metal KwikStage, 5 Boards with 3m lifts 9.1 10.0 10.5 m run/hr
Metal KwikStage, House Scaffold with 3 lifts 2.8 3.2 3.8 m run/hr
Metal Tube and Fittings, 5-6 Boards wide 3.2 3.7 4.6 m run/hr
Tube and Fitting Platforms, 50-250m3 10.6 12.5 18.5 m3/hr
Tube and Fitting Platforms, 250-1000m3 18.5 22.5 24.5 m3/hr
Tube and Fitting Platforms, over 1000m3 24.5 30.0 33.5 m3/hr
Tube and Fitting Platforms, striking - 200.0 - % x erect