From emergency call-out to a delivered capital works program, on one connected cost record.

BlueTeam mobilized within 24 hours of Hurricane Michael, logging and pricing the emergency call-out on its own dispatch system. Once the scope moved from stabilization into a full reconstruction and capital-improvements program, with the hotel still operating, that program was priced and delivered in Methvin.

COST VS ALLOWABLELIVE
Work categoryAllowableCommittedStatus
Roof replacement$1.00M$0.85MOn budget
Building envelope$1.20M$1.05MOn budget
PIP / common areas$1.50M$1.62MVariance
Furnishing upgrades$0.80M$0.60MOn budget
Demolition / dry-out$0.26M$0.26MOn budget
Project note. BlueTeam logged and priced the initial hurricane call-out on its own emergency-response system. Methvin was used to price and deliver the capital improvements and reconstruction program that followed.

What's on record

BlueTeam mobilized within 24 hours of Hurricane Michael. The emergency call-out was logged and priced on BlueTeam's own dispatch system. Once the job moved from stabilization into a full reconstruction and capital-improvements program, that program was priced and delivered in Methvin.

The hotel stayed open throughout. Roof replacement, building-envelope restoration, phased demolition and reconstruction, common-area remodeling and furnishing upgrades all had to be sequenced around live occupancy, while restoration scope and owner-driven PIP upgrades sat as distinct, trackable components of the same bill.

Project Profile · Hampton Inn

SectorHospitality
ContractorBlueTeam
CauseHurricane Michael
Emergency responseBlueTeam's own system
Capital worksPriced & delivered in Methvin
MobilizationWithin 24 hours
OccupancyMaintained throughout
Project launchDecember 2018
Contract value$4.76M
Project Overview

Hampton Inn Capital Improvements & Reconstruction

A $4.76M hurricane reconstruction and owner-driven PIP program, priced and delivered in Methvin after BlueTeam closed out the emergency call-out, without shutting the hotel.

Contractor
BlueTeam
Sector
Hospitality
Cause
Hurricane Michael
Contract Value
$4.76M
Capital works
Methvin
Mobilization
Within 24 hours
Occupancy
Maintained throughout
Project launch
December 2018
Roof replacement
Building-envelope restoration
Phased demolition and reconstruction
Common-area remodeling
Furnishing upgrades
Owner-driven PIP upgrades tracked separately from hurricane restoration
Hampton Inn- indoor view
Hampton Inn- outdoor view
The Challenge

Handing off from emergency response into a priced, deliverable program

BlueTeam's own system handled the call-out. Once the job moved from stabilization into full reconstruction, the commercial challenge shifted: price and deliver a program where the scope was still moving, the budget mixed two different funding sources, and the hotel never closed.

Scope that grew as work progressed

Roofing, dry-out, demolition, envelope restoration and interior reconstruction all had to be priced and tracked as inspections revealed further damage.

Construction around a live hotel

Every work package had to be sequenced and accessed without shutting the property down, a scheduling constraint with real commercial weight.

Restoration scope mixed with capital improvement

The owner folded planned PIP upgrades and remodeling into the rebuild. Knowing which dollar belongs to which budget was commercially critical.

One program, one price, one delivery record

Once the emergency phase closed out, estimate, procurement, schedule and cost control needed to sit in a single system rather than be rebuilt for delivery.
How the program was delivered

Scope → Estimate → Procurement → Cost Control, Connected

Once the capital-improvements and reconstruction program picked up from BlueTeam's emergency response, it was priced and run in Methvin, one structure from the first quantity through to the final account, rather than a separate spreadsheet for estimating, another for procurement and another for reporting.

First-principles estimating

  • Roof replacement built from labour, plant, materials and production rates
  • Full traceability into the number, not a lump sum
  • Resources and production rates in one build-up

Digital takeoff

  • Roofing, flooring, envelope and common-area quantities from drawings
  • Live link to the estimate as scope is confirmed
  • Quantities update as damage assessments evolve

Scope separation

  • Hurricane-restoration scope kept distinct from owner PIP
  • Same bill structure, separately comparable components
  • Each dollar attributable to the right budget

Procurement

  • Estimated requirement to committed supplier pricing
  • Subcontracts without re-keying across systems
  • Procurement connected to the estimate

Programme & scheduling

  • Emergency protection through dry-out, demolition, reconstruction and remodeling
  • Work sequenced around an occupied building
  • Bill items tied to the Gantt

Job costing & cost vs allowable

  • Budget, actual, claimed and paid quantities against approved allowables
  • Restoration and capital-improvement scope tracked separately
  • Variations and forecast to complete on the live record
Workflow

Disconnected tools vs. one connected record

AreaFragmented approachConnected platform
TakeoffSeparate Takeoff in separate filesLinked Digital takeoff linked directly to the estimate
EstimatingRebuilt Estimate rebuilt in spreadsheetsOnce First-principles estimate, built once
BudgetsBlended Restoration and capital-improvement costs blended togetherDistinct Restoration and capital-improvement scope tracked as comparable components
ProcurementIndependent Procurement tracked independently of the estimateConnected Procurement connected to estimated requirements
ProgrammeOutside Programme managed outside the cost recordTied Bill items incorporated into the Gantt programme
ReportingManual Reports assembled manually from multiple sourcesLive Reporting drawn from the live project record

Information moves through the project, it isn't re-entered

Estimate → Takeoff → Resources → Pricing → Procurement → Programme → Job Costing → Progress → Cost vs Allowable → Reporting.

  • Rapid emergency response paired with commercial control once the call-out closed out
  • Restoration and capital-improvement scope stayed separately traceable inside one budget
  • Digital takeoff connected physical scope to commercial value as damage assessments evolved
  • Cost vs allowable told the team whether they were still inside budget, not just what had been spent
  • The capital works program did not inherit a fresh set of spreadsheets from the emergency-response system
$4.76M
Contract value
$381k
Net savings vs allowable
8%
Margin achieved
Occupied
Hotel operations maintained
Investment & ROI

Hampton Inn Capital Improvements & Reconstruction

Cost vs allowable across the $4.76M capital-improvements and reconstruction program, restoration and PIP scope on one connected cost record.

Work CategoryAllowable ($)Committed ($)Variance ($)Status
Roof replacement1,000,000850,000+150,000 (Savings)On budget
Building envelope1,200,0001,050,000+150,000 (Savings)On budget
PIP / common areas1,500,0001,620,000-120,000 (Overrun)Variance
Furnishing upgrades800,000600,000+200,000 (Savings)On budget
Demolition / dry-out260,000259,200+800 (Savings)On budget
TOTAL PROJECT$4,760,000$4,379,200+$380,800 (Net Savings)8% Margin Achieved
$4.76M
Contract value
$380,800
Net savings vs allowable
8%
Margin achieved

Key Takeaways

Rapid emergency response requires rapid commercial control, not just rapid mobilization.
Restoration and capital-improvement scope need to stay separately traceable inside one budget.
Digital takeoff connects physical scope to commercial value as damage assessments evolve.
First-principles estimating gives visibility into what is actually driving cost.
Scheduling has to connect to the commercial scope when work happens around an occupied building.
Cost vs Allowable tells a project team whether they are still inside budget, not just what has been spent.
The handoff from an emergency-response system into a delivery platform matters, the capital works program should not inherit a fresh set of spreadsheets.

See how Methvin connects estimating, procurement and cost control

Whether it's emergency reconstruction, capital improvements, or a standard commercial build — one platform, one connected cost record.