McGurran Civils cut tender preparation to 122 hours on a £46M retirement community

Connected estimating, digital takeoff and job costing helped McGurran move from spreadsheets and email quotes to a single live budget, from tender through to delivery, on the Boughton Heath Retirement Community in Chester.

Tender preparation, per bid
Before
180 hrs
With Methvin
122 hrs
↓ 58 hours saved per tender submission
180→122
Estimating hours per tender
3d→13h
Monthly financial reconciliation
£45k
Procurement savings identified
1.2 mo
Payback period

Boughton Heath Retirement Community

A £46 million, 155-apartment retirement development across six residential buildings in Chester, delivered over a 111-week programme.

McGurran Civils priced enabling works, earthworks, drainage, utilities and foundations in Methvin, then carried the winning tender into a live project budget rather than rebuilding it after award.

Every design revision had previously meant revisiting quantities, updating worksheets and re-verifying pricing by hand. Connecting quantities, resources and cost in one workflow cut that cycle and gave the project team a budget they could actually run.

Company Profile · McGurran Civils

CompanyMcGurran Civils Limited
Experience40 years
MarketsIreland & UK
Repeat Business4 in 5 projects
Civil ScopeEnabling works, earthworks, drainage, utilities, foundations
SoftwareMethvin
The Project

Boughton Heath Retirement Community

A £46 million, 155-apartment retirement development across six residential buildings in Chester, delivered over a 111-week programme.

Location
Chester, United Kingdom
Development Value
£46 million
McGurran Contract
£4.5 million
Client
Retirement Villages Group / Thrive Living
Programme
111 weeks
Development Size
1.6-hectare site, 155 apartments
Enabling works, earthworks, drainage, utilities and foundations
Digital PDF takeoff with quantities linked live to the BoQ
First-principles rates built from labour, plant and material components
Reusable trench, pavement and foundation assemblies
Winning tender converted directly into a live project budget
Job costing tracked against the original tender
Chester Project Retirement Village
Chester Project
The Challenge

Consistency across quantities, pricing and a fixed deadline

Every design revision meant estimators had to revisit quantities, update worksheets and re-verify pricing by hand, increasing the risk of omissions and version-control errors.

Before Methvin

Manual PDF measurement
Multiple Excel workbooks for different trades
Supplier quotations managed through email
Repeated manual transfer of quantities into pricing schedules
Budget rebuilt from scratch after the tender was won

Commercial Objectives

Deliver a competitive, accurate tender within the submission period
Replace spreadsheet pricing with first-principles estimating
Eliminate duplicate data entry between takeoff and the BoQ
Convert the winning tender directly into a live project budget
Why Methvin

One workflow connecting quantities, resources and cost

The key differentiator: every rate could be traced back to its underlying labour, plant and material components.

Digital PDF Takeoff

  • Direct quantity capture from drawings

First-Principles Estimating

  • Labour, plant and material build-ups

Assembly Libraries

  • Reusable trench, pavement and foundation assemblies

Global Resource Updates

  • Instant pricing revisions across the estimate

BoQ Integration

  • Live quantities linked directly to pricing

Job Costing

  • Budget tracking against the original tender
Before / After

What changed in the commercial workflow

AreaBefore MethvinWith Methvin
MeasurementManual PDF measurement by handDigital Quantity capture from drawings
PricingSpreadsheets Multiple Excel workbooks for different tradesFirst-principles Labour, plant and material build-ups
QuantitiesDuplicate Repeated transfer into pricing schedulesLinked Live quantities connected to the BoQ
Supplier quotesEmail Quotations managed through inboxesCompared £45,000 in procurement opportunities identified
BudgetRebuilt Budget rebuilt from scratch after awardLive Winning tender converted into the project budget

From static tender to live operational budget

Tender preparation, supplier comparison and monthly commercial reporting all sat on the same connected cost record.

  • Tender preparation reduced from approximately 180 to 122 hours
  • Supplier comparison identified approximately £45,000 in procurement opportunities across materials and plant
  • Monthly commercial reporting reduced from three working days to approximately 13 hours
  • First-pass pricing error rate held under 4% during tender validation
122 hrs
Tender preparation
13 hrs
Monthly reporting
£45k
Procurement savings
1.2 mo
Payback period
Return on Investment

Quantified annual return on a £4.5M civil package

Labour, productivity and rework savings on Boughton Heath produced a 1.2-month payback against the Methvin investment.

Value DriverBasisEstimated Annual Value
Labour & ProductivityAnnual£81,000
Reduced ReworkAnnual£47,000
Total Annual Savings£128,000
£12,792
Total investment
£115,208
Net annual benefit
£9 per £1
Return on investment
Customer Perspective

What the commercial team said

Our objective was to create a single commercial workflow from takeoff through to project delivery. By connecting quantities, pricing and job costing, the estimating team gained greater visibility, and the project team inherited a live budget rather than a static tender.

EG
Emiliano Garner
Commercial Team, McGurran Civils

Key Takeaways

Tender preparation cut from 180 to 122 hours on a £46M retirement development
£4.5M McGurran civil package priced and delivered from one live budget
Monthly financial reconciliation reduced from three days to 13 hours
£45,000 in procurement opportunities identified across materials and plant
£128,000 annual savings against a £12,792 investment, 1.2-month payback
Winning tender converted directly into the project budget, not rebuilt after award

Ready to transform your estimating workflow?

Whether you're bidding a commercial development or a major civil infrastructure project, Methvin connects estimating, takeoff, procurement and job costing from tender through to delivery.

Global support · Configured around your estimating methodology