Windows, Timber Frames for Bricklaying |
1.1 |
0.5 |
0.1 |
hrs/no |
Windows, Drill, Screw & Plug extra over |
0.3 |
0.1 |
- |
hrs/no |
Door Frames, Softwood, 1.0-3.0m2 |
- |
0.2 |
- |
hrs/no |
Door Frames, Softwood, 3.0-7.0m2 |
0.5 |
0.4 |
- |
hrs/no |
Door Frames, Softwood, 7.0-10.0m2 |
1.2 |
0.8 |
- |
hrs/no |
Door Frames, Hardwood, 1.0-3.0m2 |
- |
0.3 |
- |
hrs/no |
Door Frames, Hardwood, 3.0-7.0m2 |
0.6 |
0.3 |
- |
hrs/no |
Door Frames, Hardwood, 7.0-10.0m2 |
1.4 |
1.0 |
- |
hrs/no |
Erect Water Tank Platform |
- |
2.3 |
- |
no/hr |
Fix Studding For Bath |
- |
0.1 |
- |
hrs/m |
Cut Access Hatch |
- |
0.3 |
- |
no/hr |
Floor Joists, under 3m |
9.0 |
9.6 |
11.6 |
no/hr |
Floor Joists, 3.0-4.5m |
6.8 |
7.2 |
9.7 |
no/hr |
Floor Joists, 4.5-6.0m |
5.5 |
5.8 |
7.3 |
no/hr |
Ceiling Joists, under 3m |
12.8 |
14.0 |
14.7 |
no/hr |
Ceiling Joists, 3.0-4.5m |
10.8 |
12.1 |
12.6 |
no/hr |
Ceiling Joists, 4.5-6.0m |
9.6 |
10.8 |
11.1 |
no/hr |
Ceiling Joists, Notch to Beams |
20.0 |
25.0 |
28.5 |
no/hr |
Ceiling Joists, Pack Joist Ends |
20.1 |
23.8 |
26.3 |
no/hr |
Ceiling Joists, Nailing Joists together |
- |
23.0 |
- |
m/hr |
Ceiling Joists, Bolting Joists Together |
- |
12.6 |
- |
m/hr |
Floor Boards, Butt Jointed |
- |
1.7 |
- |
m2/hr |
Floor Boards, T&G Boards, under 75mm wide |
- |
3.4 |
- |
m2/hr |
Floor Boards, T&G Boards, 75-100mm wide |
- |
3.8 |
- |
m2/hr |
Floor Boards, T&G Boards, 100-125mm wide |
- |
4.2 |
- |
m2/hr |
Floor Boards, T&G Boards, 125-150mm wide |
- |
5.5 |
- |
m2/hr |
Plywood Sheeting, Butt Jointed, nailed |
- |
9.1 |
10.2 |
m2/hr |
Plywood Sheeting, Butt Jointed, screwed |
- |
4.1 |
4.8 |
m2/hr |
Plywood Sheeting, T&G Jointed, nailed |
- |
8.3 |
9.1 |
m2/hr |
Plywood Sheeting, T&G Jointed, screwed |
- |
4.0 |
4.6 |
m2/hr |
Chipboard Sheeting, Butt Jointed, nailed |
- |
10.0 |
11.5 |
m2/hr |
Chipboard Sheeting, Butt Jointed, screwed |
- |
5.1 |
5.8 |
m2/hr |
Chipboard Sheeting, T&G Jointed, nailed |
- |
9.3 |
9.1 |
m2/hr |
Chipboard Sheeting, T&G Jointed, screwed |
- |
5.5 |
5.9 |
m2/hr |