Planning Production Rates
Task / Description | Slow | Ave | Fast | Units |
Boarding to Plaster dabs | 3.6 | 4.0 | 5.5 | m2/hr |
Boarding to Stud-work/Metal Lathes | 4.0 | 5.0 | 6.7 | m2/hr |
Boarding 12mm nailed to studding | - | 12.5 | - | m2/hr |
Boarding 19mm nailed to studding | - | 16.5 | - | m2/hr |
Tape, Jointing and Sanding | - | 0.1 | - | hrs/m |