Case Study · Energy Infrastructure

How Skanstec Delivered Meta's Power Grid on Time & on Budget

A 12-month hyperscale data centre substation in Odense, Denmark — managed end-to-end on Methvin's integrated platform, from first estimate to final commissioning.

Methvin · ODN Substation — Project Dashboard
ODN Substation & Grid Connection
Odense, Denmark · Client: Meta
● Active
📋
Estimating
EPC cost model
📐
Takeoff
Civil quantities
🏗
BIM
Substation model
RFI
43 resolved
Civil & Structural Works100%
HV/MV Grid Integration100%
Underground Ducting Network100%

Executive Summary

Skanstec, a specialist turnkey engineering company within the H&MV Engineering Group, was appointed lead engineering and infrastructure delivery partner for the ODN Substation — a critical high-voltage/medium-voltage power facility enabling Meta's hyperscale data centre campus in Odense, Denmark.

The project demanded precise coordination across electrical grid integration, reinforced civil structures, and complex underground service networks — all under a rigid 12-month schedule with zero tolerance for power interruption. Skanstec deployed Methvin across five integrated modules: Project Management, Estimating, Takeoff, RFI, and BIM, unifying every phase of the EPC lifecycle on a single platform.

The result was a grid-compliant, highly resilient power node commissioned on schedule and in full compliance with European ISO and sustainability standards — directly enabling the operational capacity of one of Meta's most significant European data centre investments.

Company Profile · Skanstec

IndustryEnergy & Telecom Infrastructure
Foundedc. 2020 (acquired by H&MV Engineering Group, 2024)
Group Revenue~€400M (H&MV Group)
Employees1,000+ across the group
RegionsEurope (EMEA)
Delivery ModelTurnkey EPC
CertificationsISO-certified processes; BIM/LEAN principles
SoftwareMethvin
Project Overview

ODN Substation & Grid Connection

Meta's hyperscale data centre campus in Odense required an entirely new, purpose-built power node — and it had to be right first time. Meta's Odense campus is one of the company's largest European investments in hyperscale compute infrastructure. Data centres of this scale demand power systems built to the highest standards of resilience, redundancy, and regulatory compliance — there is no room for iterative commissioning or phased handover.

Project
ODN Substation & Grid Connection
Client
Meta (Facebook)
Location
Odense, Denmark
Contract
Turnkey EPC
Duration
12 Months
Scope
HV/MV Substation, Grid Connection, Civil Works
Grid Class
HV/MV
Modules Used
5 Methvin modules
Full HV substation design and build with grid connection line installation
Pre-commissioning, energisation testing, and handover to the Danish transmission network
Heavy-duty reinforced concrete transformer bases and blast deflection walls
In-situ concrete for modular switchgear building foundations
Precision HV/MV/LV ducting networks and comprehensive subterranean earthing grid
Storm drainage with oil interceptors meeting Danish environmental standards
The Challenge

Complexity at Every Layer

A hyperscale data centre substation is not a typical construction project. Skanstec faced compounding technical, coordination, and schedule pressures from day one.

Estimating & coordination challenges

Early-stage cost modelling for EPC projects of this scale relied on spreadsheets that couldn't reflect the interdependencies between electrical, civil, and underground scopes. Quantity changes cascaded in ways that were difficult to track and reconcile across teams.
Precise civil and ducting quantities had to be extracted from highly technical engineering drawings. Manual measurement was slow, error-prone, and made revision comparison extremely difficult when design changes arrived mid-programme.

"Managing a project of this scale — an EPC substation for a hyperscale client with no schedule tolerance — required every discipline to work from the same source of truth. Methvin gave us that. From the initial estimate through to the final RFI close-out, everything was in one place."

— Senior Project Manager · Skanstec

Delivery & BIM challenges

Critical infrastructure projects generate significant technical queries between engineering disciplines. With no formal RFI workflow, questions were tracked via email threads — creating latency, version confusion, and accountability gaps that posed genuine programme risk.
Integrating the electrical, structural, and underground services models in a live substation environment required a BIM workflow that all disciplines could work within — without relying on multiple unconnected authoring platforms and manual clash-check rounds.
Software Used

Methvin Modules Deployed

Five integrated modules — each purpose-built for construction, working together across the full EPC lifecycle.

Project Management

  • Gantt scheduling & milestones
  • Task allocation across disciplines
  • Programme tracking & reporting
  • Cross-team visibility dashboard

Estimating

  • First-principles EPC cost model
  • Resource & rate libraries
  • Multi-discipline work package pricing
  • Revision history & audit trail

Takeoff

  • PDF-based measurement tools
  • Drawing revision comparison
  • Civil & ducting quantity extraction
  • Auto-linked to estimate

RFI

  • Structured RFI register & workflow
  • Ball-in-court tracking
  • Response audit trail
  • Linked to drawings & docs

BIM

  • Multi-discipline model federation
  • Clash detection & issue logging
  • 4D programme integration
  • Structured model review workflow
Workflow Transformation

Before Methvin vs After Methvin

AreaBefore MethvinAfter Methvin
EstimatingFragmented Multi-tab spreadsheets per discipline; no cross-scope linking; manual reconciliation on every revisionIntegrated Single integrated EPC cost model with linked work packages; revisions tracked automatically
TakeoffManual Manual measurement from printed or PDF drawings; revision changes required complete remeasureDigital Digital takeoff with PDF overlay; drawing revision comparison with auto-delta quantities
RFI ManagementAd hoc Email threads; no formal register; response latency and accountability gapsStructured Structured RFI register with ball-in-court tracking; full audit trail and programme linkage
BIM CoordinationSiloed Discipline models exchanged via file transfer; clash detection run in isolated sessionsFederated Federated model environment with live clash detection and structured issue register
Programme & ReportingDelayed Weekly status updates compiled manually; no real-time visibility across disciplinesLive Live dashboards; Gantt schedule with milestone tracking; instant cross-team status reporting

Project Outcomes & Platform Results

What a fully integrated Methvin deployment delivered on one of Europe's most demanding infrastructure projects.

  • 12-month programme delivered on schedule with no handover slippage
  • Full HV/MV substation commissioned and energised to Danish grid standards
  • RFI register closed out with zero unresolved queries at handover
  • BIM clash resolution completed prior to any civil works commencing on site
  • All civil and ducting quantities traced directly from Takeoff to the live estimate
  • ISO-compliant project documentation maintained throughout across all modules
  • Complete audit trail from initial estimate through to final cost report
12mo
Project delivered on schedule end-to-end
5
Methvin modules integrated across the EPC lifecycle
0
Unresolved RFIs at project handover
100%
ISO-compliant documentation maintained throughout
ROI Analysis

Quantified platform value on a fixed EPC programme

Schedule certainty and rework avoidance on critical infrastructure contracts deliver measurable returns beyond direct software cost.

Value DriverBasisEstimated Annual Value
Estimating & takeoff integrationEliminated reconciliation rounds across electrical, civil, and underground scopes6+ weeks saved
RFI workflow formalisationStructured register with ball-in-court tracking from mobilisationZero backlog at handover
BIM-led clash preventionMulti-discipline coordination resolved before civil works commencedRework removed from critical path
Programme reporting automationLive dashboards replaced weekly manual status compilation200+ hours saved
Total estimated valueSchedule certainty on a fixed 12-month EPC contract
12mo
Programme delivered on schedule
5
Integrated modules deployed
100%
ISO-compliant documentation
Client Perspective

In Their Own Words

Methvin gave us one platform for everything — from the first quantities through to the last RFI. On a project like this, where Meta's schedule is non-negotiable and every discipline has to move in lockstep, that level of integration isn't a nice-to-have. It's what lets you actually deliver. We had full visibility at every stage, and when issues came up, we could track them, assign them, and close them out without anything falling through the cracks.

DM
David Mulryan
Project Director · Skanstec
Lessons Learned

What Skanstec learned

  • Integrating Takeoff directly with Estimating from the outset eliminated the costly reconciliation rounds that typically occur when quantities and cost models are maintained separately.
  • Establishing the RFI register before mobilisation — rather than after the first design queries arrived — meant the programme never lost momentum waiting on untracked answers.
  • BIM clash detection ahead of civil works commencement prevented costly on-site rework that would have threatened the schedule on a fixed-duration EPC contract.
  • Training all disciplines on a single platform, rather than siloing module adoption per team, created the cross-functional visibility that made real-time reporting possible.
  • ISO-compliant documentation is far easier to maintain when it is built into the workflow rather than compiled retrospectively from scattered sources.
Future Plans

What comes next for Skanstec

  • Methvin to be standardised across all future H&MV Group EPC projects as the default delivery platform, eliminating per-project tool selection decisions.
  • Expand Estimating module usage to include Methvin's procurement and supplier quoting workflows, reducing the time from cost model to subcontract award.
  • Leverage BIM integration more deeply on upcoming grid connection projects, using 4D programme linkage to drive site sequencing decisions.
  • Explore Methvin's Job Costing module to provide live budget-versus-actual visibility throughout construction, rather than end-of-month reporting cycles.
  • Roll out Methvin's Document Control module to bring drawing register and transmittal management within the same platform as RFI and BIM workflows.

Key Takeaways

Schedule certainty on a fixed 12-month EPC contract with no programme slippage attributable to information or coordination failures
Single source of truth across Estimating, Takeoff, BIM, RFI, and Project Management — not reconciled from separate systems
ISO-compliant documentation maintained throughout, not assembled retrospectively at handover under time pressure
Zero RFI backlog at handover through structured workflow with ball-in-court tracking
BIM-led clash prevention resolved interface conflicts before civil works commenced
Methvin's five-module deployment on ODN establishes a repeatable delivery model for all future H&MV Group infrastructure projects

Deliver Your Next Complex Project on Methvin

Integrated estimating, takeoff, BIM, RFI, and project management — built for the way infrastructure teams actually work.