Case Study · Civil Infrastructure · Earthworks & Infrastructure

How RGCC Is Running a AED 52.5M Villa Township Infrastructure Contract on Methvin

Ramah General Contracting & Transport (RGCC) is delivering the demolition, earthworks and infrastructure package for 122 luxury villas and a township at Al Jurf — estimated and managed end-to-end on Methvin's estimating and job costing platform.

JOB COSTING — COST CODE SUMMARYLIVE
Cost CodeBudgetCommitted
DemolitionAED 4.1MAED 3.6M
EarthworksAED 21.8MAED 14.2M
Roads & AccessAED 9.6MAED 3.1M
Utilities InfrastructureAED 14.9MAED 2.4M
Township Enabling WorksAED 2.1MAED 0.4M

Executive Summary

In May 2025, Ramah General Contracting & Transport L.L.C (RGCC), an Abu Dhabi-based civil infrastructure contractor, was awarded a AED 52,520,671.46 contract to deliver the infrastructure works for the Ohana Development at Al Jurf JAQ Project — a masterplanned community of 122 luxury villas and an integrated township on the Arabian Gulf coastline between Dubai and Abu Dhabi.

The scope covers demolition, heavy earthworks and the full infrastructure backbone — roads, utilities and site enabling works — required to bring a low-density, sustainability-led coastal development to construction-ready condition. RGCC is delivering the works in collaboration with Nova International General Contracting LLC, under the supervision of Ohana - OTAK International.

RGCC estimated and is managing the contract on Methvin's estimating and project management platform, using the Job Costing app to track budget, commitments and progress against cost codes across demolition, earthworks and infrastructure packages from a single connected system.

Contractor Profile · RGCC

CompanyRamah General Contracting & Transport L.L.C
BaseMussafah Industrial Area, Abu Dhabi
Core ServicesInfrastructure, Enabling & Earthworks
SpecialismUtility installation, road networks, site development
Platform UsedMethvin — Estimating & Job Costing
Project Overview

Ohana Development at Al Jurf — JAQ Project

Demolition, earthworks and infrastructure delivery for a low-density, sustainability-led coastal township between Dubai and Abu Dhabi.

Scope
Demolition, Earthworks & Infrastructure
Contract Value
AED 52,520,671.46
Start Date
21 May 2025
Client
Ohana - OTAK International
Collaborating Contractor
Nova International General Contracting LLC
Location
Al Jurf, Arabian Gulf coast
Phase 1 — Demolition & site clearance across the villa and township footprint
Phase 2 — Heavy earthworks: excavation, grading and backfilling for 122 villas
Phase 3 — Infrastructure installation: roads, utilities and site development
Phase 4 — Ongoing job costing, progress claims and reporting through to handover
The Challenge

Delivering a large earthworks and infrastructure package in a sensitive coastal setting

RGCC needed accurate first-principles estimating to win the bid and continuous budget-versus-committed visibility through a long-duration contract.

An eco-sensitive coastal site

Al Jurf's masterplan combines protected nature reserves, private beaches and landscaped parks — demolition and earthworks had to be sequenced and costed with that sensitivity in mind.

Multi-party delivery

RGCC is delivering the works alongside Nova International General Contracting LLC, under the direct supervision of Ohana - OTAK International — requiring clear, auditable cost and progress reporting.

Scale of earthworks

Site clearance, excavation, grading and backfilling across a 122-villa township is a heavy civil undertaking that needed accurate first-principles estimating to win and price correctly.

Long-duration cost control

A AED 52.5M contract spanning demolition through to township infrastructure handover needs continuous budget-versus-committed visibility, not periodic spreadsheet reconciliation.
Solution

Software used on Methvin

RGCC estimated and is delivering the contract using the following Methvin modules.

Estimating

  • First-principles estimating for demolition and earthworks
  • Rate libraries and assemblies for infrastructure packages
  • Estimate structured ahead of contract award
  • Pricing aligned to cost code structure for job costing

Job Costing App

  • Budget, commitments and actuals by cost code
  • Demolition, earthworks and infrastructure scopes tracked separately
  • Live cost position across the full contract duration
  • Shared visibility for collaborating contractors

Progress Claims

  • Monthly progress claims to Ohana - OTAK International
  • Claims structured against agreed cost codes
  • Milestone-based reporting through delivery phases
  • Auditable claim history for multi-party supervision

Reporting

  • Dashboards for budget vs committed vs actual
  • Forecasts across demolition and infrastructure packages
  • Shared cost visibility for RGCC and Nova International
  • Reporting aligned to client supervision requirements
Workflow Transformation

Typical earthworks contract vs on Methvin

AreaBefore MethvinAfter Methvin
EstimatingDisconnected Estimate built in spreadsheets, separate from cost trackingConnected Estimate carries directly into the Job Costing app
Cost codesManual Cost codes re-keyed into a separate job costing toolShared Cost codes shared between estimating and cost control
Progress claimsAd hoc Progress claims assembled manually each monthStructured Progress claims structured against the same cost codes
Cost visibilityDelayed Budget-vs-actual visibility lags site progressLive Budget, committed and actual costs tracked in one place

Built for the scale of civil & infrastructure contracting

Methvin gives RGCC one platform from first-principles estimating through to job costing on a multi-scope coastal infrastructure contract.

  • One platform carries the estimate through to job costing — no re-keying cost codes
  • Supports multi-contractor delivery with shared, auditable cost visibility
  • Handles first-principles estimating for demolition and heavy earthworks
  • Structures progress claims against the same cost codes used to win the bid
AED 52.5M
Contract value
122
Villas delivered to
2
Contractors collaborating
3
Scopes — demolition, earthworks, infrastructure
Contract Value Drivers

Where Methvin supports a contract of this scale

On a long-duration AED 52.5M infrastructure package, connected estimating and job costing reduces rework and reporting lag across every delivery phase.

Value DriverBasisEstimated Annual Value
Estimate-to-job-costing continuityCost codes carry from tender through delivery — no re-keyingReduced setup & reconciliation time
Multi-scope cost visibilityDemolition, earthworks and infrastructure tracked by cost codeFaster commercial decisions
Structured progress claimsClaims aligned to the same cost codes used at awardLess monthly claim assembly
Multi-party reportingShared dashboards for RGCC and collaborating contractorsAuditable supervision reporting
Platform coverageEstimating → Job Costing → Claims → Reporting
AED 52.5M
Contract under management
4
Methvin modules in use
May 2025
Contract commencement
From the Site

What the team said

Estimating and job costing on one platform means our cost codes carry straight through from the bid into the field. On a contract this size, with two contractors delivering under Ohana - OTAK's supervision, that's what lets us keep budget, committed and actual costs aligned in real time — instead of reconciling spreadsheets after the fact.

RG
RGCC Project Team
Ramah General Contracting & Transport L.L.C
Scope & Execution

Four delivery phases from May 2025

  • Phase 1 — Demolition & site clearance to enable earthworks and infrastructure installation
  • Phase 2 — Heavy earthworks: excavation, grading and backfilling for 122 villas and township facilities
  • Phase 3 — Infrastructure installation: roads, utilities and site development for the sustainable community plan
  • Phase 4 — Ongoing job costing, progress claims and reporting to Ohana - OTAK International through to completion
Platform Approach

Why Methvin fits this contract

  • First-principles estimating priced demolition, earthworks and infrastructure packages ahead of award
  • Job Costing tracks budget and commitments across all scopes from a single connected system
  • Progress claims structured against the same cost codes used to win the bid
  • Multi-contractor delivery supported with shared, auditable cost visibility

Key Takeaways

AED 52.5M villa township infrastructure contract estimated and managed on Methvin
122 luxury villas and integrated township at Al Jurf on the Arabian Gulf coast
Demolition, earthworks and infrastructure scopes tracked by cost code in Job Costing
Multi-party delivery with Nova International under Ohana - OTAK International supervision
Estimate carries directly into job costing — no re-keying between commercial and site teams
Progress claims structured against the same cost codes used at contract award

See what Methvin can do for your next infrastructure contract