Deliver projects on time, every time
Methvin's integrated Gantt scheduler and resource management tools give construction teams full visibility over timelines, dependencies and workforce allocation — from tender award through to practical completion.
Why teams choose Methvin Scheduling
Built for the complexity of construction — not retrofitted from generic project management software.
Real-time programme visibility
Every task update, delay flag and milestone change is reflected instantly across all stakeholders. No more emailing spreadsheets or reconciling offline versions — your programme is always the single source of truth.
Linked to your estimate
Schedules pull directly from Methvin's Estimating module so resource quantities, durations and costs remain aligned from the moment the job is won. Changes to scope cascade automatically rather than creating downstream surprises.
Conflict-free resource allocation
Visualise labour, plant and subcontractor commitments across all active projects simultaneously. Identify clashes before they become variations and rebalance allocations in seconds using drag-and-drop scheduling.
Critical path & earned value
Automatically compute the critical path for every programme and track earned value against baseline. Early warning indicators surface at-risk tasks before delays compound, giving project managers time to act rather than report.
Integrated tools for every delivery phase
From programme build through to handover, Methvin connects every discipline in one platform.
Gantt Scheduler
Build interactive Gantt charts with task dependencies, baselines, milestones and progress tracking. Drag to reschedule and watch linked tasks cascade automatically.
Explore Gantt →Project Management
Centralise RFIs, submittals, drawing registers, site instructions and correspondence. Every document is version-controlled and linked to the relevant programme activity.
Explore Project Management →Estimate
Link live cost plans directly to schedule activities so resource demand, cost-to-complete and cash-flow forecasts update the moment the programme changes — no manual reconciliation required.
Explore Estimating →BIM Integration
Connect 4D BIM models to Gantt activities and visualise the sequence of construction in three dimensions. Clash-detect schedule conflicts before they manifest on site.
Explore BIM →Purpose-built for construction programmes
Generic project tools don't understand construction. Methvin was designed from the ground up for builders, contractors and project managers who need a scheduler that speaks their language.
- Predecessor and successor dependencies with lag and lead times
- Multi-project resource levelling across your entire portfolio
- Automated lookahead reports (2-week, 4-week, 6-week)
- Progress S-curves and earned value reporting in one click
- Role-based permissions so subcontractors update their own tasks
- Offline-capable mobile app for on-site progress capture
Trusted by construction teams worldwide
What project managers and schedulers say about Methvin on G2.
“"Finally a Gantt tool that understands how construction actually works. We can link our estimate to the programme and the cash flow updates automatically. No more reconciling three different spreadsheets."”
“"The resource levelling across multiple projects is the feature I didn't know I needed. We used to allocate key supervisors from memory. Now I can see conflicts three weeks out and fix them before they become problems."”
“"Switching from P6 to Methvin cut our schedule prep time significantly. The 4D BIM link is genuinely useful — we can show the client exactly what's being built each fortnight directly from the Gantt, no separate animation software needed."”
Frequently asked questions
Everything you need to know before getting your first programme live.
Can I import an existing programme from MS Project or Primavera?
Yes. Methvin supports import of .mpp (MS Project) and XER (Primavera P6) files. Tasks, dependencies, baselines and resource assignments are mapped automatically so you can be up and running in minutes rather than rebuilding from scratch.
How does resource management work across multiple projects?
Methvin's portfolio view aggregates all active projects into a single resource histogram. You can filter by role, trade or individual, see total demand versus available capacity, and reassign allocations directly from the same screen without switching between projects.
Does the schedule link to the Methvin Estimating module?
Yes — this integration is one of Methvin's core differentiators. Activity durations and resource quantities from the estimate populate the initial programme, and cost-to-complete figures update as progress is recorded, keeping your earned value reporting current without manual data entry.
Can subcontractors access and update their own tasks?
Absolutely. You can invite subcontractors as limited-access collaborators. They see only the activities assigned to them, can mark progress and flag issues, but cannot alter the master programme — giving you live data without compromising programme integrity.
What does the BIM integration actually involve?
You upload an IFC model and link model objects to Gantt tasks. Methvin then generates a 4D sequence animation from the linked data. No separate simulation software is required. The model viewer also supports clash detection to identify spatial conflicts in the build sequence before they reach site.
Is there a mobile app for capturing progress on site?
Yes. The Methvin mobile app works on iOS and Android and supports offline progress capture. Updates sync automatically when connectivity is restored. Site supervisors can mark tasks complete, attach photos and raise flags directly against programme activities without leaving the field.
Get Started for Free
Set up your first programme in under 20 minutes. No credit card, no complex onboarding — just a better way to plan.
No credit card required · Cancel anytime · Global support