Appendix A: Sample Resource Build-Up (Illustrative Extract)

The lines below are an illustrative extract only, shown to demonstrate the structure of the underlying build-up — not an actual project estimate. A typical project build-up runs to 500+ lines across all elements; this shows 15, drawn from three.

ItemDescriptionQuantityUnitResource type
1Pile Cap Type A — Concrete 25MPa12.4Material
2Pile Cap Type A — Reinforcement1.2tMaterial
3Pile Cap Type A — Formwork18.6Material
4Pile Cap Type A — Placing & finishing labour14hrsLabour
5Pile Cap Type A — Excavation plant6hrsPlant
6Column Type B — Concrete 32MPa3.8Material
7Column Type B — Reinforcement0.6tMaterial
8Column Type B — Formwork (reusable system)22.0Material
9Column Type B — Steel fixing labour9hrsLabour
10Column Type B — Concrete placing labour5hrsLabour
11Suspended Slab — Concrete 32MPa42.5Material
12Suspended Slab — Reinforcement mesh2.1tMaterial
13Suspended Slab — Formwork & propping165.0Material
14Suspended Slab — Placing & finishing labour28hrsLabour
15Suspended Slab — Concrete pump (plant)10hrsPlant

Each row of this kind is what the audit trail in Section 8 refers back to: a resource quantity, in its natural unit, that can be traced forward to a cost and a programme duration, or backward to the formula and Global Variable that generated it.